Great Rock WindpowerAWEA

Clean Energy for Martha's Vineyard

Wind Turbine Comparison Chart


ARE 110
Skystream 3.7
Endurance
Scirocco
Maker
A.R.E.
Southwest Windpower Endurance Windpower Eoltec

Entegrity

Model
ARE 110
Skystream Endurance S250 Scirocco EW50
Rotor Diameter
12'
12' 18' 18' 50'

Inverter

Life expectancy less than 20 years

SMA Windy Boy
Built in to Nacelle No inverter necessary Power-One Aurora No inverter necessary
High wind protection
Side Furl and Dynamic Braking
Dynamic Braking only Stall control constant speed and disk brake on rotor Passive blade pitch control

Tip Brake Parking Brake for Servicing

Wind Swept Area
110 ft²
116 ft² 256 ft² 265 ft² 1902 ft²

Estimated Monthly Production @12/mph average windspeed on a 100' tower with 35' trees

370 kWh

Estimated

225 kWh

Estimated

650 kWh

Estimated

750 kWh

Estimated

5000 kWh

Estimated

These production numbers represent predicted turbine performance. Performance at your site and with varying tower heights will be different. Production will likely be higher in winter months and lower in summer months.

Turbine with 105' tower*
$24,000
$15,000 $33,500 $37,500 $150,000

Shipping & MTC Turnkey Installation**

16,000
15,000 20,000 21,000 75,000

MTC Rebate Example max

$9,200
$8,400 $17,200 $22,800 $40,000
Stae and Federal Tax credit s***
$13,000
$10,000 $16,050 $18550 $77,500
Cost after rebate and tax credits
$17,800
$11,600 $19,250 $17,150 $116,500

Cost per kWh over 20 years

.20
.21 .12 .10 .10
Maintenance
Annual Inspection
Annual Inspection Annual Lubrication and inspection Annual Lubrication and inspection Annual Lubrication and inspection

* Includes required monitoring equipment for MTC rebate, all prices subject to change

** Includes estimated shipping. Prices will vary according to site conditions.

***Please consult your accountants as to your actual tax credit